Free UST Compliance Checklist

A comprehensive checklist covering every federal EPA requirement for underground storage tank systems. Covers monthly, quarterly, annual, and multi-year obligations.

Get the printable PDF version

Enter your email to download the checklist and get compliance deadline alerts.

Monthly Requirements

  • Release detection monitoring performed and documented
  • ATG system alarm log reviewed
  • Visual inspection of spill buckets and fill caps
  • Dispenser sumps inspected for liquid
  • Inventory reconciliation completed (stick readings vs ATG)
  • Variance thresholds checked (<1% or 130 gal, whichever is greater)
  • Line leak detector tests verified functional

Quarterly Requirements

  • Cathodic protection system readings recorded (if impressed current)
  • Emergency shutoff valves tested
  • Containment sump sensors tested
  • Fire extinguishers inspected
  • Spill prevention equipment condition verified

Annual Requirements

  • Walkthrough inspection completed (40 CFR 280.36)
  • Walkthrough inspection documentation filed
  • Operator training records current (Class A, B, C)
  • Financial responsibility documentation renewed/verified
  • Tank registration renewed with state agency
  • Annual tank fees paid
  • Insurance certificates current (pollution liability)
  • SPCC plan reviewed and updated (if applicable)
  • Emergency response plan reviewed
  • Employee training records updated

Every 3 Years

  • Cathodic protection testing performed (impressed current systems)
  • Compliance inspection by state agency or third-party
  • Line tightness testing (if required by state)
  • ATG system certification/calibration

Every 5 Years

  • Cathodic protection testing (sacrificial anode systems)
  • SPCC plan professional engineer review
  • Tank integrity assessment (if single-wall)
  • Precision tank test (if required by state)

Record Keeping (Maintain On-Site)

  • Release detection records (minimum 1 year, 3 years recommended)
  • Corrosion protection records (life of tank)
  • Repair records (life of tank)
  • Closure records (permanent)
  • Financial responsibility documentation (current)
  • Operator training certificates (current + 1 year after departure)
  • Walkthrough inspection reports (minimum 1 year)
  • Calibration records for all monitoring equipment
Note: This checklist covers federal EPA requirements under 40 CFR 280. Your state may have additional requirements. Always verify with your state UST program.