Monthly Requirements
Release detection monitoring performed and documented
ATG system alarm log reviewed
Visual inspection of spill buckets and fill caps
Dispenser sumps inspected for liquid
Inventory reconciliation completed (stick readings vs ATG)
Variance thresholds checked (<1% or 130 gal, whichever is greater)
Line leak detector tests verified functional
Quarterly Requirements
Cathodic protection system readings recorded (if impressed current)
Emergency shutoff valves tested
Containment sump sensors tested
Fire extinguishers inspected
Spill prevention equipment condition verified
Annual Requirements
Walkthrough inspection completed (40 CFR 280.36)
Walkthrough inspection documentation filed
Operator training records current (Class A, B, C)
Financial responsibility documentation renewed/verified
Tank registration renewed with state agency
Insurance certificates current (pollution liability)
SPCC plan reviewed and updated (if applicable)
Emergency response plan reviewed
Employee training records updated
Record Keeping (Maintain On-Site)
Release detection records (minimum 1 year, 3 years recommended)
Corrosion protection records (life of tank)
Repair records (life of tank)
Closure records (permanent)
Financial responsibility documentation (current)
Operator training certificates (current + 1 year after departure)
Walkthrough inspection reports (minimum 1 year)
Calibration records for all monitoring equipment